Stop Spending $80,000 to $200,000 a Year on Walls You Throw Away.

CONSTRUCTION SITES

Every general contractor running five or more projects a year has done the math and ignored it. Temporary drywall barriers are in the bid. They are familiar. And every single one ends up in a dumpster at project close, while you budget the same line item for the next job. On an average GC portfolio, that is $80,000 to $200,000 in annual waste. Modwalls install in hours, reuse across 100 or more projects, and require no skilled trades. Your first purchase is the last time you pay for temporary barriers.

No commitment. Receive pricing and ROI estimate within 1 business day.

$80K-$200K

Avg Annual GC Drywall Barrier Waste

2-3

Projects to Full Payback

100+

Reuses Per Panel Set

Hours

Install Time vs Days for Drywall

THE HIDDEN COST OF THROWAWAY WALLS

The Real Cost of Disposable Barriers Is Not on the Bid Sheet.

The drywall barrier line item looks cheap on the bid. It is not cheap when you run the annual total. It is not cheap when your drywall crew does not show, and your project timeline slips by three days. It is not cheap when your GC-subcontractor relationship takes the hit because the schedule slipped, and the general superintendent is on the phone wanting to know why a temporary wall cost you a week.

The actual cost of drywall barriers is the material, the labor, the waste disposal, the rescheduling when trades are unavailable, and the full rebuild cost on the next project. Then the project was after that. Modwalls GCs pay for the system once and run it across their entire project portfolio for years.

Single-Use Waste Eats Project Margin

Temporary drywall is a consumable material with no residual value. Every panel you build, and tear down is a cost with zero recovery. Modwalls panels are capital assets that retain and deliver value across 100 or more project deployments.

Skilled Trade Dependency and Scheduling

Drywall subcontractors are harder to schedule and more expensive every year. When your crew does not show, your timeline slips and your GC relationship takes the damage. Modwalls install with general labor – on your schedule, not your sub’s.

OSHA Dust Control and Compliance

Construction dust control is not optional on occupied sites. A non-compliant barrier is an OSHA citation and a project to halt. Modwalls panels are sealed, debris-free, and shipped with OSHA compliance documentation for occupied-site applications.

Idle Time and Project Timeline Risk

Every extra installation day is a cost. Drywall installation creates a scheduling dependency that does not exist with Modwalls. A small general labor team deploys the complete system in a single shift – and takes it down just as fast at project close.

YOUR FAST-TRACK FROM QUOTE TO INSTALL

From Quote to Installed Barrier in Days, Not Weeks.

1

Quote and ROI Review

Submit your project scope and annual barriers. We return a detailed pricing proposal, deployment timeline, and ROI calculation showing your payback point within 1 business day.

Day 1

2

Manufacturing and Delivery

Panels are factory-cut to your specifications and shipped to your project site on your timeline. No waiting on a subcontractor’s crew availability.

Day 2-15

3

Installation

General labor installs the complete system in a single shift. Your project continues schedule.

Same Day

THE MODWALLS GC ADVANTAGE

Six Reasons High-Volume GCs Choose Modwalls Over Drywall.

Install in Hours, No Skilled Trades

A general labor team with basic hand tools installs the complete system in a single shift. No drywall license. No specialty equipment. No sub scheduling that controls your timeline.

Reuse Across 100 or More Projects

Every panel reconfigures, moves, and reinstalls. Buy the system once and run it across your entire project portfolio for years. The math gets clearer every time you redeploy.

OSHA Compliant Dust Control

Sealed panels. Zero construction of debris. Full OSHA compliance documentation for occupied-site applications. No citation risk. No project halt.

Rent or Buy, Your Choice

Rent for a single project to validate the system. Buy when the math makes it obvious, which is usually after projecting two or three. We show you both scenarios with your numbers before you decide.

Zero Landfill, LEED Conscious

No drywall debris. No waste of disposal costs. No landfills. For GCs working on LEED projects or with sustainability-conscious owners, the compliance story builds itself.

American-Made Since 1989

Allied Modular has manufactured in the United States for over 35 years. Not a re-branded import product. Full domestic manufacturing documentation available for Buy American projects.

START YOUR JOBSITE BARRIER TODAY

Get Your Free Modwalls Quote Now

Fill out the form and receive a detailed pricing proposal, deployment timeline, and full documentation package within 1 business day.

No sales pressure. No commitment is required.

Included with every order

  • OSHA dust control compliance documentation
  • Factory-cut panels to your project specifications
  • ROI analysis comparing Modwalls to your current annual barrier spend
  • Installation guide for general labor crews
  • Allied Modular limited warranty

REUSABLE

FULLY DOCUMENTED

READY TO INSTALL

WHAT General Contractors ASK FIRST

The 5 Questions Every General Contractor Asks Before Choosing Modwalls.

How do Modwalls compare to drywall on total project cost?

On a single project, drywall may appear cheaper on the initial bid. GCs running five or more temporary barrier projects per year typically spend $80,000 to $200,000 annually on single-use drywall material and labor. Modwalls panels are purchased once and reused across 100 or more deployments. Most GC portfolios hit full payback within 2 to 3 projects. We will run your specific numbers before you make any decisions.

Do I need a licensed drywall subcontractor to install Modwalls?

No. That is the point. Standard temporary drywall requires licensed framing and drywall crews who are increasingly difficult to schedule and more expensive every year. Modwalls install with a small general labor team using basic hand tools. Most projects are fully deployed in a single shift. No specialty license. No specialty equipment.

What happens if I need a non-standard ceiling height or custom dimension?

Standard. Not a special order. Every Modwalls quote includes a factory cut list based on your floor plan. Non-standard ceiling heights, angled ceilings, and custom widths are handled in the quote process with no extended lead time.

Is the rent or buy decision straightforward?

We make it straightforward. Submit your annual barrier spend and project frequency and return a side-by-side financial comparison showing rental cost per project versus purchase payback timeline. Most GCs who see the comparison choose to purchase. Rental is the right choice when you need to prove the system on a single project first.

Can Modwalls be specified in my project bid documents?

Yes. Spec sheets are available in our Spec Library, formatted for direct inclusion in bid documents. We are listed on ARCAT and available through the Sweets Network. For government and Buy American projects, full domestic manufacturing documentation is included in the spec package.

Still Have Questions? Call 1-888-836-7850

More Applications

Modwalls Works Across Every High-Stakes Environment.

Healthcare

Healthcare

ICRA Class II-IV · Infection Control · Overnight Deploy

Mobile office interior with modular partition walls

Mobile Office Customization

Custom Layouts · Reconfigure Per Client · Fast Quote

Trailer Fleet Refurbishment

Trailer Fleet Refurbishment

Fast Turnaround · Reusable Interiors · Fleet ROI

YOUR LAST THROWAWAY BARRIER

Stop Rebuilding the Same Barrier on Every Project.

Request pricing, a deployment timeline, and a full ROI calculation for your project portfolio. Most GCs recover their investment within 2 to 3 projects.

Or call 1-888-836-7850 · sales@alliedmodular.com